Jump to content

New Purchase/Build - Home Renovations - Gardens - Garages & Sheds.


Recommended Posts

  • Gold Donating Members
  • Member For: 10y 4m 30d
  • Gender: Not Telling

No, not any more. It's just a relief valve so easy fix. It's separate from the hws anyway.

 

Still a pita at this time of night, hence the water and power off etc.

 

My phone always corrects on to in the bastard.

  • Dropping a turd
  • Gold Donating Members
  • Member For: 17y 8m 2d
  • Gender: Male
  • Location: Perth

that's ok.  You can chop fluffs house down to fuel you chip heater.

  • Bob the Freaking Builder
  • Donating Members
  • Member For: 15y 9m 16d
  • Gender: Female
  • Location: SA

Pushing ahead as fast as I can crack the whip at this stage....

 

The Chippies have been on site for 3 weeks and almost completed bottom story, top story, front porticos and alfrescos with the roof trusses and frame work hopefully being done buy the end of this week. 

Given we don’t wanna waste time, lower story glass installed also last week while chippies still worked on the upper level. 
 

Greatest part is now we can stand on the upper level (by ladder at the moment) and we have an amazing view of all the CBD buildings and then the rolling hills behind, which is awesome. 
 

1hTLzIj.jpg

 

 

Taking the littlest upstairs for the first time to have a look.... 

 

rEEOHcN.jpg

Edited by Mrs Jeturbo
  • Like 4
  • Dropping a turd
  • Gold Donating Members
  • Member For: 17y 8m 2d
  • Gender: Male
  • Location: Perth

Going up  fast. I never had two story. 

 

Each house I build I visit every weekend to see progress and make sure no dodgy sh*t, and take  heaps of photos. 

  • Bob the Freaking Builder
  • Donating Members
  • Member For: 15y 9m 16d
  • Gender: Female
  • Location: SA

So I down skilled today and instead of being Mrs PM, I spent the day being J@s electrical TA 🤣

 

My calves are sore, my shoulders have had a work out, but we managed to get downstairs downlighting, feature lighting and GPO’s done and a few upstairs GPOs done also.... on house 1 LOL
 

Now to do the rest of the upstairs GPOs and lighting .... then to finish off with all data and speakers which include the provisions for: 

 

- Ceiling Bluetooth/Wifi speakers 

- Data points throughout 

- Data to our locking system which is for the proximity door strike (meaning keyless) 

- XL Cable provisions for a swim spa down the back also. 
 

Working out where I want down lights  will be the death of me one day LOL. 

  • Feeling the Love :-)
  • Bronze Donating Members
  • Member For: 12y 2m 28d
  • Gender: Male
  • Location: Not in Cairns anymore
  On 13/07/2020 at 8:57 AM, Mrs Jeturbo said:

  Data points throughout 

  Data to our locking system which is for the proximity door strike (meaning keyless) 

Expand  

you're going to need a network cabinet

  • Bob the Freaking Builder
  • Donating Members
  • Member For: 15y 9m 16d
  • Gender: Female
  • Location: SA

Got one upstairs ;)

 

So today, despite the fog, we had Rhino Rails installed getting ready For the roof trusses, gutters and flashings to go on in the next few days.... got back after work to do some more sparkle stuff also. Fun Fun. 
 

nVS22Kt.jpg

CDPs3EM.jpg

SzbnI6Z.jpg

  • Like 4
  • ...JD TUNING ADELAIDE...
  • Gold Donating Members
  • Member For: 17y 29d
  • Gender: Male
  • Location: Adelaide

Whose the Mad \!/ who drives a sprint onto a building site ðŸ™ƒ

  • Haha 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
  • Create New...
'