Jump to content

New Purchase/Build - Home Renovations - Gardens - Garages & Sheds.


Pixy Angel

Recommended Posts

  • Puff
  • Gold Donating Members
  • Member For: 9y 9m 30d
  • Gender: Male
  • Location: South Australia

No, not any more. It's just a relief valve so easy fix. It's separate from the hws anyway.

 

Still a pita at this time of night, hence the water and power off etc.

 

My phone always corrects on to in the bastard.

Link to comment
Share on other sites

  • Bob the Freaking Builder
  • Donating Members
  • Member For: 15y 2m 15d
  • Gender: Female
  • Location: SA

Pushing ahead as fast as I can crack the whip at this stage....

 

The Chippies have been on site for 3 weeks and almost completed bottom story, top story, front porticos and alfrescos with the roof trusses and frame work hopefully being done buy the end of this week. 

Given we don’t wanna waste time, lower story glass installed also last week while chippies still worked on the upper level. 
 

Greatest part is now we can stand on the upper level (by ladder at the moment) and we have an amazing view of all the CBD buildings and then the rolling hills behind, which is awesome. 
 

1hTLzIj.jpg

 

 

Taking the littlest upstairs for the first time to have a look.... 

 

rEEOHcN.jpg

Edited by Mrs Jeturbo
  • Like 4
Link to comment
Share on other sites

  • Dropping a turd
  • Gold Donating Members
  • Member For: 17y 1m 1d
  • Gender: Male
  • Location: Perth

Going up  fast. I never had two story. 

 

Each house I build I visit every weekend to see progress and make sure no dodgy sh*t, and take  heaps of photos. 

Link to comment
Share on other sites

  • Bob the Freaking Builder
  • Donating Members
  • Member For: 15y 2m 15d
  • Gender: Female
  • Location: SA

So I down skilled today and instead of being Mrs PM, I spent the day being J@s electrical TA 🤣

 

My calves are sore, my shoulders have had a work out, but we managed to get downstairs downlighting, feature lighting and GPO’s done and a few upstairs GPOs done also.... on house 1 LOL
 

Now to do the rest of the upstairs GPOs and lighting .... then to finish off with all data and speakers which include the provisions for: 

 

- Ceiling Bluetooth/Wifi speakers 

- Data points throughout 

- Data to our locking system which is for the proximity door strike (meaning keyless) 

- XL Cable provisions for a swim spa down the back also. 
 

Working out where I want down lights  will be the death of me one day LOL. 

Link to comment
Share on other sites

  • Feeling the Love :-)
  • Bronze Donating Members
  • Member For: 11y 7m 28d
  • Gender: Male
  • Location: Not in Cairns anymore
2 hours ago, Mrs Jeturbo said:

  Data points throughout 

  Data to our locking system which is for the proximity door strike (meaning keyless) 

you're going to need a network cabinet

Link to comment
Share on other sites

  • Bob the Freaking Builder
  • Donating Members
  • Member For: 15y 2m 15d
  • Gender: Female
  • Location: SA

Got one upstairs ;)

 

So today, despite the fog, we had Rhino Rails installed getting ready For the roof trusses, gutters and flashings to go on in the next few days.... got back after work to do some more sparkle stuff also. Fun Fun. 
 

nVS22Kt.jpg

CDPs3EM.jpg

SzbnI6Z.jpg

  • Like 4
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
  • Create New...
'