busy week and finally the frames are going up.

On Wednesday it all happened. 6:30am crane arrived followed by the first truck for the frames a short time later.

At one stage there was the Crane, 2 frame trucks, delivery truck with sand, blue wash, recycle mix  and the truck with the bricks on.5 truck at once. 

Only some of the bricks were delivered for the top half of the house.

We still have the front frame to go up and over the garage.

 

The crane

frame_zpsuqa6upsf.jpg

 

frame-2_zpseszyumbx.jpg

 

Inside the garage

frame-15_zpsgyyqnhj9.jpg

 

 

frame-24_zps4oh5tmyf.jpg

 

Alfresco area

frame-16_zpsf7sxmbuz.jpg

 

frame-20_zpsd21q7mly.jpg

 

Steel Frame over the garage

frame-21_zps2q38nmfp.jpg

 

Back of the house.

frame-22_zpswekfjc13.jpg

 

frame-23_zpsqouye0ex.jpg

 

 

 

 

 

 

  • Like 1
Link to comment
Share on other sites

  • Expert
  • Donating Members
  • Member For: 19y 11m 17d
  • Gender: Male
  • Location: North Jamberoo, NSW

It still feels small ATM, we did a walk through the kids bed rooms and the main bathroom and it felt small.

rooms are 3x3.2 smallest at 3x3.6 largest.

Link to comment
Share on other sites

  • Manual mode ________________________ All day, erryday
  • Donating Members
  • Member For: 17y 2m 19d
  • Gender: Male
  • Location: Probably above atmospheric pressure

Now that the last few posts have loaded for me...

 

Never thought about only doing partial in the ensuite toilet.  Just discussed with the missus and we are thinking of now using our feature tile from the rest of it as a horizontal divider at about tit height or maybe just above the cistern...

 

Tiler said he was advised that the builder require us to pay them for ensuite extras, but that beyond that they will turn a blind eye during the tiling stage.  Massive win, tiler is 1/3 the price and it will all be done before we move in!  He's got a 2 week gap before his next job so it works out nicely.

 

We might put that offset squares style shelving up later above the stove top bench, either side of the rangehood that will be going in.  I don't like the idea of big dark cubpoards closing in the kitchen space, so we think that would be a good trade off of having extra storage space but not being imposing.

  • Like 2
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
  • Create New...
'