El Andrew Gold Donating Members 2,036 Member For: 9y 8m 7d Gender: Male Location: Canberra ACT Posted 18/04/20 09:21 AM Share Posted 18/04/20 09:21 AM Thanks guys. No, didn't lube although the part I'm thinking is leaking was pre-assembled. Re thread sealant, I thought that wasn't required on AN fittings?Having a bit more of a look into it, yes I've definitely fluffed it by not removing the riser. Thread into the core is 7/16 which is what the supplied adaptor was. However that fitting doesn't want to start into the core (only trying by hand - a stripped oil feed thread in my core will make.my day worse not better). I'm going to play it safe and assume I've wrecked the adaptor thread by screwing it into the riser and grab a new adaptor.Still doesn't solve the location of the leak though. Maybe though if that adaptor to riser joint was leaking, under pressure it is running up the hose a bit and concealing where the actual leak is? I'll start with a.new 7/16 to AN -4 adaptor, install it properly and see where I am at. Link to comment Share on other sites More sharing options...
arronm Dropping a turd Gold Donating Members 9,520 Member For: 17y 2m 3d Gender: Male Location: Perth Posted 18/04/20 10:03 AM Share Posted 18/04/20 10:03 AM I use Teflon grease on all fitting to prevent galling. 2 Link to comment Share on other sites More sharing options...
bloodycrashboy Feeling the Love :-) Bronze Donating Members 4,421 Member For: 11y 8m 28d Gender: Male Location: Not in Cairns anymore Posted 18/04/20 10:24 AM Share Posted 18/04/20 10:24 AM we use "Tefgel" at work for all our stainless threaded applications https://www.tefgel.com.au/shop/tef-gel-tube 1 Link to comment Share on other sites More sharing options...
OZYWALKER XR50T Gold Donating Members 2,795 Member For: 11y 7m 28d Gender: Male Location: Western Sydney Posted 22/04/20 09:25 AM Share Posted 22/04/20 09:25 AM Bellend numpty Muppet fùck knuckles who don't get jumping from site to site is a waste of time even though it keeps certain customers happy.You'd think organising things in advance would be smart but nope, back to mushroom management keeping the "supervisors" in the dark feeding them sh*te.Give it a week before walkouts.ConstructionduringcoronaaintsofunWeeeeeeeeeeeeeee 1 Link to comment Share on other sites More sharing options...
JETURBO ...JD TUNING ADELAIDE... Gold Donating Members 23,708 Member For: 16y 6m 28d Gender: Male Location: Adelaide Posted 22/04/20 09:47 AM Share Posted 22/04/20 09:47 AM Know all dem feels with Built Environs/Mc Donnel dowel as the builder totes Shyte khuntzzz Link to comment Share on other sites More sharing options...
.Stripes. All stock bar the k&n panel filter Silver Donating Members 8,061 Member For: 12y 9m 16d Gender: Male Location: Perth Posted 01/05/20 11:09 AM Share Posted 01/05/20 11:09 AM Just work in general atm. Don't get me wrong, super grateful to still be employed, but fark me...I've done 111hrs overtime (unpaid) in the last 6 weeks...and will no doubt have to do some work over this weekend too...probably even more in the future. Fun fun...I'm farking wrecked... Link to comment Share on other sites More sharing options...
k31th less WHY; more WOT Site Developer 29,072 Member For: 16y 8m 20d Gender: Male Location: Melbourne Posted 01/05/20 11:10 AM Share Posted 01/05/20 11:10 AM so there's no agreements to pay overtime? I know that feeling... Link to comment Share on other sites More sharing options...
.Stripes. All stock bar the k&n panel filter Silver Donating Members 8,061 Member For: 12y 9m 16d Gender: Male Location: Perth Posted 01/05/20 11:20 AM Share Posted 01/05/20 11:20 AM (edited) Nope. Days in lieu at managers discretion. They spoke with me yesterday, as they're concerned about the hours I'm working...and so I asked them where I can cut back, coz they've reduced hours (to reduce costs) of some of the higher paid peeps, and they said "well if we took some of x work off you for a week could you get some of this other stuff done to get ahead"...but the problem is there's then no-one else to do that work, which comes through regularly each and needs doing reasonably quickly. So they were like "oh, hmm...yeah I guess that's not gonna work for the next month". Meanwhile, they're trying to tell me to be more billable...but work less. Sigh. I just wanna hibernate for a couple of weeks and just play guitar and go cycling and watch tv. Edited 01/05/20 11:21 AM by .Stripes. Link to comment Share on other sites More sharing options...
k31th less WHY; more WOT Site Developer 29,072 Member For: 16y 8m 20d Gender: Male Location: Melbourne Posted 01/05/20 11:26 AM Share Posted 01/05/20 11:26 AM sounds like a bit of a struggle... but I hope you're getting those days in lieu as there might be a future time that you can use 'em or at least bank 'em enough to be paid out. Link to comment Share on other sites More sharing options...
.Stripes. All stock bar the k&n panel filter Silver Donating Members 8,061 Member For: 12y 9m 16d Gender: Male Location: Perth Posted 01/05/20 11:34 AM Share Posted 01/05/20 11:34 AM Me too...I'm keeping a timesheet, obviously for tax with the whole working from home dealio through COVID, but yeah. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now